Virginia DOT P3 Office- Hampton Roads ETL’s
Working as a sub consultant to Ernst & Young, PILLAR teamed with HNTB and others to provide advice and OMR cost estimates for various P3 transportation projects

PennDOT Rapid Bridge Replacement
PILLAR served as an advisor to a development team led by Kiewit/Infrared/Parsons. As part of its duties, PILLAR reviewed and commented on O&M subcontractor pricing and plans. This project aims to replace 558 aging spans throughout Pennsylvania with modern bridges.

Toronto 407 PH 2
PILLAR provided a second OMR estimate, drafted portions of the O&M report to the LTA, and wrote a full draft of an OMR technical proposal. Highway 407 is the world’s first all-electronic, open access toll highway.

TXDOT SH288
Serving as an advisor to the successful development team of ACS/Infrared/Shikun Binui on TXDOT’s Drive 288 project. PILLAR provided a second OMR estimate, drafted portions of an O&M report to the LTA, and wrote a full draft of OMR technical proposal.

Regina Bypass
PILLAR was contracted to serve as an O&M advisor to a confidential client, with the scope of the work including a snow removal estimate for the bypass, which include 60 kilometers of four-lane highway and 12 new overpasses.

TXDOT New Harbor Bridge
PILLAR served as an advisor to Miller Infrastructures, an O&M subcontractor; prepared a routine O&M estimate for this project, the longest cable stay bridge in the U.S.

New Champlain Bridge (NBSL)
PILLAR was hired to write an operational O&M manual and schedule for this 3.4-kilometer span, one of the busiest in North America with 50 million vehicles crossing it each year.

Winnipeg Transit
PILLAR prepared an O&M routine and rehab price estimate, which included snow removal. This transitway is a high-speed road designed for buses, separate from the regular traffic system. This enables buses to get to and from downtown more quickly.

Calgary SW Ring Road
PILLAR was hired as an advisor to ACS, preparing a detailed snow plan and cost estimate for this 31-kilometer stretch of six- and eight-lane roadway in the Alberta province. The plan will enhance the safe, efficient movement of goods and people around Calgary.

CDOT I70 East
PILLAR was an O&M advisor to ACS Infrastructure/Hochtief/AECOM. In this role, PILLAR reviewed bid documents; assisted with bid strategy and subcontractor pricing, including a detailed snow plan; and assisted with O&M report to the LTA.

I-75 Modernization (Michigan)
PILLAR was contracted to serve as an O&M technical advisor to the Walsh-led team on the I-75 widening and reconstruction project, providing review and assessment for RFP documents and assisting bid strategy and pricing review.