With drainage ditches failing to convey stormwater runoff at the Bastian Rest Area due to years of wear by tractor trailers, PILLAR was hired to survey the ditch and design a remedy. Despite challenges posed by a limited area and presence of a slope, PILLAR came up with a solution to convey the runoff and prevent damage from occurring again.